歡迎來(lái)到裝配圖網(wǎng)! | 幫助中心 裝配圖網(wǎng)zhuangpeitu.com!
裝配圖網(wǎng)
ImageVerifierCode 換一換
首頁(yè) 裝配圖網(wǎng) > 資源分類 > DOC文檔下載  

土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價(jià)的未來(lái)

  • 資源ID:28065688       資源大?。?span id="0ysinxd" class="font-tahoma">154.50KB        全文頁(yè)數(shù):21頁(yè)
  • 資源格式: DOC        下載積分:15積分
快捷下載 游客一鍵下載
會(huì)員登錄下載
微信登錄下載
三方登錄下載: 微信開(kāi)放平臺(tái)登錄 支付寶登錄   QQ登錄   微博登錄  
二維碼
微信掃一掃登錄
下載資源需要15積分
郵箱/手機(jī):
溫馨提示:
用戶名和密碼都是您填寫的郵箱或者手機(jī)號(hào),方便查詢和重復(fù)下載(系統(tǒng)自動(dòng)生成)
支付方式: 支付寶    微信支付   
驗(yàn)證碼:   換一換

 
賬號(hào):
密碼:
驗(yàn)證碼:   換一換
  忘記密碼?
    
友情提示
2、PDF文件下載后,可能會(huì)被瀏覽器默認(rèn)打開(kāi),此種情況可以點(diǎn)擊瀏覽器菜單,保存網(wǎng)頁(yè)到桌面,就可以正常下載了。
3、本站不支持迅雷下載,請(qǐng)使用電腦自帶的IE瀏覽器,或者360瀏覽器、谷歌瀏覽器下載即可。
4、本站資源下載后的文檔和圖紙-無(wú)水印,預(yù)覽文檔經(jīng)過(guò)壓縮,下載后原文更清晰。
5、試題試卷類文檔,如果標(biāo)題沒(méi)有明確說(shuō)明有答案則都視為沒(méi)有答案,請(qǐng)知曉。

土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價(jià)的未來(lái)

本 科 生 畢 業(yè) 設(shè) 計(jì)(論文)外文翻譯( 2009 屆)題目:Estimating Future Highway Construction Costs 2009年 2 月 19 日Estimating Future Highway Construction CostsC. G. Wilmot, M.ASCE,1 and G. Cheng, P.E.2Abstract: The objective of this research was to develop a model that estimates future highway construction costs in Louisiana. The model describes overall highway construction cost in terms of a highway construction cost index. The index is a composite measure of the cost of construction labor, materials, and equipment; the characteristics of contracts; and the environment in which contracts are let. Future construction costs are described in terms of predicted index values based on forecasts of the price of construction labor, materials, and equipment and the expected contract characteristics and contract environments. The contract characteristics and contract environments that are under the control of highway agency officials, can be manipulated to reflect future cost-cutting policies. Application of the model in forecasting to highway construction costs in Louisiana shows that the model closely replicates past construction costs for the period 19841997. When applied to forecasting future highway construction costs, the model predicts that highway construction costs in Louisiana will double between 1998 and 2015. Applying cost-cutting policies and assuming input costs are 20% less than anticipated, the model estimates highway construction costs will increase by 75% between 1998 and 2015.Key words: Highway construction; Costs; Estimation.IntroductionState Departments of Transportation are required to prepare highway construction programs that describe their planned construction activity in the short term. There is usually considerable interest in the program from local authorities, politicians, and interest groups. Draft programs are typically presented to the public and to various agencies at the local, regional, state, and federal level for comment and review. Ultimately, a program will be approved by the state legislature and will become the formal program of construction of the state Department of Transportation until a new program is developed in the next cycle a few years later.Because individual projects are of considerable importance to politicians and individual interest groups, it is common that progress on a construction program is closely monitored. Any deviation is likely to be queried, and the Secretary of the state Department of Transportation or a senior official in the department will often have to defend the situation publicly or in the state legislature. This can lead to perceptions of incompetence and erosion of support from the legislature and the public.To prepare reliable highway construction programs, road authorities must have accurate estimates of future funding and project costs. While future funding is obviously never known witha great deal of certainty, it is often the estimation of project costs that cause upsets in the execution of construction programs. Inaccurate cost estimation is one source of error, but another, the escalation in cost of a project over time, is another source disruption to the program that is usually not anticipated and catered for. Typically, when projects are costed, their costs are estimated in terms of the current cost of the project, and this estimate is not adjusted for the year in which the project is scheduled for implementation. These cost increases can be significant and are, of course, cumulative across projects; also, they rise at an increasing rate each year into the future. Estimating future highway construction is the focus of this paper. The model developed in this study was developed with data from the Louisiana Department of Transportation and Development DOTD! and is therefore particular to that state. However, the methodology employed could be employed in other areas.Measuring Project CostsWhen construction in the field lags behind planned construction in the construction program, it is usually because the projects that have been constructed have cost more than anticipated. This is not random variation of actual costs about estimated costs, because, clearly, underestimates would cancel out overestimates over time in such a situation. Rather, it is evidence of a consistent underestimateof all projects collectively. The benefit of this is that it can be measured at the overall level, which is much easier to measure than at the individual project level.In the past, change in overall construction costs has been measured in terms of construction indices. These indices are weighted averages of the cost of a set of representative pay items over time. They have been used to display cost trends in the past. However, there is no reason why cost indices must be restricted to displaying past trends; they can also portray future overall costs, provided the representative pay items on which the index is based can be forecast. A predictive construction cost index was adopted in this study to describe the change in overall construction costs in the future. The formulation of the index is described later in the paper.Past Increases in Construction CostsWhen the change in overall construction costs in the past is observed(as measured by popular construction cost indices), it is apparent that they change significantly from year to year and that the changes can sometimes be quite erratic. The common assumption that construction costs change with the rate of inflation can lead to poor estimates of future construction cost. To illustrate, the Federal Highway Administrations Composite Bid Price Index, an index of overall highway construction costs, is plotted in Fig. 1 together with the Consumer Price Index (CPI), a common expression of general inflation. The FHWA CBPI for the entire nation and for Louisiana alone is plotted in the diagram. All indices have been normalized to a value of 100 in 1987 for comparison purposes. From the diagram, it is clear that highway construction costs change erratically and even display different short and long-term trends from to those of the CPI. It is also apparent that construction cost changes are different in Louisiana from those in the nation as a whole. While not shown here, review of the FHWA CBPI from other states shows that many of them show a deviation from national values.Past Methods of Forecasting Highway Construction CostForecasting future highway construction costs has been achieved in basically three ways in the past. First, unit rates of construction such as dollars per mile by highway type have been used to estimate construction costs in the short term. However, this method has generally been found to be unreliable, because site conditions such as topography, in situ soil, land prices, environment, and traffic loads vary sufficiently from location to location to make average prices inaccurate estimates of the price of individual projects or even of all projects in a particular year. Second, extrapolation of past trends, or time-series analysis, has been used to forecast future overall construction costs (Koppula 1981; Hartgen et al. 1997). Typically, construction costs have been collapsed in these analyses to a single overall expression of constructioncost such as the FHWA CBPI or the Engineering News Records Building Construction Index ENR BCI! or Construction Cost Index ENR CCI!. However, these types of models are usually only used for short-term forecasting due to their reliance on the notion that past conditions are maintained in the future. Third, models have been established that describe construction costs as a function of factors believed to influence construction costs. The relationship between construction costs and these factors have been established from past records of construction costs. Typically, the models established in this manner have been used to estimate the cost of individual contracts. These models, with their relational structure, are the only models expected to provide reliable long-term estimates. The model developed in this study is of this type.Proposed Construction Cost ModelIt is clear that there are numerous factors that affect construction costs. However, it is striking that most construction cost models developed in the past have used only a few of the many influential factors identified above. One reason for this is that information is generally not available on many factors in data sets used to estimate models. Another reason is that information on the qualitative conditions surrounding each contract is difficult to obtain. These are problems that prevail in most circumstances and are difficult to overcome.To mitigate against the effect of an incomplete set of factors, two strategies can be employed. First, it may be possible to represent some of the absent factors by surrogate variables that are in the data set. For example, as mentioned earlier, annual bid volume has been used in the past as an inverse measure of the level of competition prevailing in the construction industry at that time (Herbsman 1986). Similarly, the number of plan changes each year can serve as a measure of design quality. Second, if the modeling of construction cost is changed from estimating the cost of individual projects to estimating overall construction costs each year, the modeling task is simplified. This is because it is no longer necessary to try to model individual projects in which conditions inflate the price in one case and deflate it in another, since such conditions would tend to cancel themselves out among projects in the same year. For example, firms that reduce their bid prices in an effort to win a particular contract could be balanced out within the same fiscal year by those that increase their prices because they already have enough work and are not particularly interested in winning the contract. Similarly, those firms with expertise in the type of construction required will be balanced out by those with low levels of expertise in that area. Thus, it is generally more tolerable to operate with fewer relevant factors when modeling at the aggregate or overall level than when modeling at the disaggregate level.The objective of this study is to establish a model, estimated on historical quantitative data, that incorporates as many relevant variables as possible and is capable of estimating the future overall cost of highway construction on an annual basis. The model is intended to assess the impact of alternative future conditions on highway construction costs and assist officials of the Louisiana DOTD to identify management policies that will help limit the increase in highway construction costs in the state.It was also the perception of those interviewed that contracts let in the fourth quarter of the fiscal year tended to result in higher bid prices. This was because there was a tendency for projects to accumulate in the fourth quarter due to various delays, and the increased volume of projects resulted in decreased competition among contractors.Model StructureThe model developed to predict overall highway construction costs in this study is based on five submodels of price estimation. Each submodel estimates the price of a pay item representative of cost model a dominant construction area. Dominant construction areas were identified from past expenditure in different areas of highway construction. From the Louisiana DOTD data for the period19841997, it was found that more than 50% of all highway construction expenditure occurred in the areas of asphalt concrete surfaces, Portland cement concrete surfaces, excavation and embankment, structural steel, structural concrete, and reinforcing steel. Interestingly, these construction areas are identical to those used to estimate the FHWA CBPI. The structural steel construction area was not included in the model developed in this study, because more than 98% of expenditure in this construction area was bid as a lump sum in each contract with no record of the amount of steel included in the bid. This made comparison of the cost of structural steel among contracts impossible. The other five construction areas included in the model were all represented by pay items whose prices were expressed in terms of rates, which permitted comparison among contracts.A schematic representation of the overall model with its five submodels is shown in Fig. 2. Each submodel estimates the price of a representative pay item from each of the five dominant construction areas. The contribution of each submodel to the overall model is accomplished by combining the prices of the representative pay items in an index similar to that of the FHWA CBPI. In this case, because the formulation is slightly different from the FHWA CBPI and is constructed specifically to reflect past and future overall construction costs in Louisiana, it is named the Louisiana Highway Construction Index and is defined asValidationModel performance is ideally validated using data not used in the estimation of the model. In this case no such data was available. Dividing the existing data set into two portions to estimate the model on one portion and use the other for validation was not practical, given the limited sample size in some of the submodels. For example, the concrete pavement submodel has a total of only 212 observations, and estimating the submodel on the highly variable data on fewer observations would reduce the accuracy of the estimates. Thus, the performance of the model was assessed by observing how well it reproduced observed construction costs.Using the same data as that on which the model was calibrated, the estimated and observed LHCI values for the period 19841997 are shown in Fig. 3. The 95% confidence limit of the observed LHCI is also shown in the figure to illustrate that the estimated LHCI values are, for the most part, contained within the 95% confidence limit of the observed LHCI values. The chisquared test of the similarity of the estimated and observed LHCI values indicates that a significant difference could not be observed at the 99% level of significance.Investigating the behavior of the construction cost index in Fig. 3 reveals interesting reasons behind the observed behavior. Reviewing the data and observing its impact on the forecasts through the model allows an analyst to determine the primary causes of change in construction costs during certain periods in the past. For example, the main cause of the decrease in construction costs observed in the period 19841986 can be traced back to a decline in labor and petroleum costs during that period. The rapid increase in construction costs from 1995 to 1996 was primarily due to a combination of rising petroleum costs and an increased proportion of smaller contracts. The drop in construction costs observed immediately following this event (i.e., in 1997) was mainly the consequence of an increase in the average size of projects from those let in 1996, very few projects being let in the fourth quarter, and a decrease in the average duration of projects.ConclusionsThis study has shown that the literature indicates that a comprehensive set of factors contributes to the cost of highway construction. In this study, the most influential factors were found to be the cost of the material, labor, and equipment used in constructing the facility. However, characteristics of individual contracts and the contracting environment in which contracts are let also affect construction costs. In particular, contract size, duration, location, and the quarter in which the contract is let were found to have a significant impact on contract cost. Bid volume, bid volume variance, number of plan changes, and changes in construction practice, standards, or specifications also make a significant impact on contract costs. Other factors are expected to have an impact on construction costs but were not included in this analysis because no data on their values were available.The model developed in this study reproduces past overall construction costs reasonably accurately at the aggregate level. Predicted overall construction costs are not significantly different from observed costs at the 99% level of significance. This accuracy is largely the result of the aggregate level at which construction costs are measured in this study; at the individual contract level, the submodels capture only between 42 and 72% of the variation in the data. It is suspected that much of this variation is due to unobserved, essentially subjective factors that influence the bid prices in individual contracts. However, some of these idiosyncratic variations at the individual contract level average out in the aggregation process.This model can be used by highway officials in Louisiana to test alternative contract management strategies. Increasing contract sizes, reducing the duration of contracts, reducing bid volume and bid volume variance, reducing the number of plan changes, and reducing the proportion of contracts let in the fourth quarter all serve to reduce overall construction costs. Highway officials can assess the impact of strategies they believe are achievable by applying the model. Most importantly, though, the model can assist in estimating future construction costs and providing the means to produce more reliable construction programs.ReferenceAssociate Professor, Louisiana Transportation Research Center and Dept. of Civil and Environmental Engineering, Louisiana State Univ., Baton Rouge, LA 70803-6405.Civil Engineer, GEC, Inc., 9357 Interline Ave., Baton Rouge, LA 70809. C. G. Wilmot, M.ASCE, and G. Cheng, P.EEstimating Future Highway Construction CostsJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ASCE / MAY/JUNE 2003:272279Huyn P.N., Geneserth M.R. and Letsinger R. (1993). Automated concurrent engineering in design. World Computing, Vol. 26 (1), pp 7476. ISO (1994). ISO 10303-1 Part 1: Overview and fundamental principles, International Organization for Standardization, Geneva, Switzerland. Kalay Y.E., Khemluni L. and Choi J.W. (1998). An integrated model to support distributed collaborative design of buildings. Automation in Construction, Vol. 7 (23), pp 177188. Lee H.K., Lee Y.S., Kim K.H. and Kim J.J. (2007). A cost-based information model for an interior design in a large-scale housing project, ICCIT 07, 2007 International Conference on Convergence Information Technology, Poster Sessions: Session 4.Luiten G.T.B. and Tolman F.P. (1997). Automating communication, in civil engineering. Journal of Construction Engineering and Management, Vol. 123 (2), pp 113-120. 公路建設(shè)造價(jià)的未來(lái)C. G. Wilmot, M.ASCE,1 and G. Cheng, P.E.21聯(lián)合教授,路易斯安娜運(yùn)輸研究中心和國(guó)家環(huán)境工程局,路易斯安娜國(guó)立大學(xué)2注冊(cè)工程師摘要;本文的目標(biāo)是建立一個(gè)用來(lái)估算路易斯安娜未來(lái)公路建設(shè)所需的工程費(fèi)用的模型。根據(jù)公路建設(shè)造價(jià)索引,該模型介紹了中所有公路建設(shè)的工程費(fèi)用。這索引是一份綜合定額,包括建造的人工費(fèi),材料費(fèi)和機(jī)械費(fèi),項(xiàng)目特征和項(xiàng)目周邊的環(huán)境情況等等。未來(lái)工程的費(fèi)用是用預(yù)計(jì)值來(lái)進(jìn)行指定的,預(yù)計(jì)值是建立在建造人工費(fèi),材料費(fèi),機(jī)械費(fèi)和預(yù)見(jiàn)項(xiàng)目特征和項(xiàng)目環(huán)境基礎(chǔ)上的預(yù)測(cè)價(jià)格。在公路管理機(jī)構(gòu)控制下的項(xiàng)目特征和項(xiàng)目環(huán)境能可根據(jù)未來(lái)的成本削減政策來(lái)操作處理。公路造價(jià)預(yù)算模型在路易斯安娜的運(yùn)用表現(xiàn)出這模型幾乎是19841997年時(shí)建設(shè)造價(jià)模型的重現(xiàn)。未來(lái)在運(yùn)用公路造價(jià)預(yù)算時(shí),該模型預(yù)測(cè)路易斯安娜的公路造價(jià)將在1998年到2015年間的增加兩倍。在應(yīng)用削減成本政策和假設(shè)投入的資金比預(yù)算減少20%的情況下,模型預(yù)測(cè)公路造價(jià)將在1998年到2015年間提高75%。關(guān)鍵詞:公路建設(shè),造價(jià),預(yù)算引言國(guó)家交通部被要求籌備能反映他們短期建設(shè)計(jì)劃的公路建設(shè)綱要。通常地方當(dāng)局,政治家和利益集團(tuán)都會(huì)對(duì)此項(xiàng)目投以極大的關(guān)注。草案一般會(huì)向社會(huì)、地方、省、國(guó)家各部門和標(biāo)準(zhǔn)聯(lián)合會(huì)征求意見(jiàn)和建議。最后,項(xiàng)目將由國(guó)家立法機(jī)關(guān)批準(zhǔn),在一段時(shí)間后的下一輪新項(xiàng)目立項(xiàng)中成為國(guó)家交通部的正式建設(shè)項(xiàng)目。因?yàn)樘厥忭?xiàng)目對(duì)于政治家和個(gè)別利益集團(tuán)是非常重要的,通常要對(duì)工程過(guò)程進(jìn)行監(jiān)理。任何偏差都有可能被質(zhì)疑,國(guó)家交通部長(zhǎng)和資深官員將不得不公開(kāi)或找國(guó)家立法機(jī)構(gòu)對(duì)情況進(jìn)行辯護(hù)。這會(huì)導(dǎo)致使人不相信你的能力,并使來(lái)自立法機(jī)構(gòu)和公眾的支持受到?jīng)_擊。籌備可靠的公路建設(shè)項(xiàng)目,公路管理機(jī)構(gòu)必須對(duì)預(yù)留資金和工程造價(jià)有精確的評(píng)估。然而很明顯,預(yù)留資金永遠(yuǎn)不能確保,通常是對(duì)在建設(shè)項(xiàng)目實(shí)施中引起混亂的項(xiàng)目造價(jià)的評(píng)估。不準(zhǔn)確的造價(jià)意見(jiàn)是一個(gè)錯(cuò)誤來(lái)源,但另一方面,不斷過(guò)時(shí)的工程造價(jià)是另一個(gè)使項(xiàng)目失敗的原因,這些通常沒(méi)有預(yù)料和準(zhǔn)備,一般,工程造價(jià)是根據(jù)一系列現(xiàn)在的工程造價(jià)判斷的,如果不符,完工時(shí)進(jìn)行調(diào)整。造價(jià)增加是有效的,當(dāng)然是漸增的,而且,他們每年按一定比例增加。本文的核心是估計(jì)未來(lái)公路建設(shè)。本研究中模型建立的資料來(lái)自路易斯安娜交通和發(fā)展部(DOTD),是特別針對(duì)這個(gè)州的。然后,這種方法可在其他領(lǐng)域使用。項(xiàng)目造價(jià)估量當(dāng)某領(lǐng)域建設(shè)落后于建設(shè)計(jì)劃中的進(jìn)度,通常是因?yàn)橐呀?jīng)建造的項(xiàng)目費(fèi)超過(guò)了預(yù)期費(fèi)用。實(shí)際費(fèi)用相對(duì)于預(yù)算不是隨意變動(dòng)的,因?yàn)楹苊黠@在這種情況下過(guò)低估計(jì)與過(guò)高估計(jì)會(huì)相互抵消。而且,這是所有項(xiàng)

注意事項(xiàng)

本文(土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價(jià)的未來(lái))為本站會(huì)員(仙***)主動(dòng)上傳,裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。 若此文所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng)(點(diǎn)擊聯(lián)系客服),我們立即給予刪除!

溫馨提示:如果因?yàn)榫W(wǎng)速或其他原因下載失敗請(qǐng)重新下載,重復(fù)下載不扣分。




關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號(hào):ICP2024067431號(hào)-1 川公網(wǎng)安備51140202000466號(hào)


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺(tái),本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請(qǐng)立即通知裝配圖網(wǎng),我們立即給予刪除!