土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價的未來

上傳人:仙*** 文檔編號:28065688 上傳時間:2021-08-23 格式:DOC 頁數(shù):21 大小:154.50KB
收藏 版權(quán)申訴 舉報 下載
土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價的未來_第1頁
第1頁 / 共21頁
土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價的未來_第2頁
第2頁 / 共21頁
土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價的未來_第3頁
第3頁 / 共21頁

下載文檔到電腦,查找使用更方便

15 積分

下載資源

還剩頁未讀,繼續(xù)閱讀

資源描述:

《土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價的未來》由會員分享,可在線閱讀,更多相關(guān)《土木工程 建筑 外文翻譯 外文文獻(xiàn) 英文文獻(xiàn) 公路建設(shè)造價的未來(21頁珍藏版)》請在裝配圖網(wǎng)上搜索。

1、 本 科 生 畢 業(yè) 設(shè) 計(論文)外文翻譯( 2009 屆)題目:Estimating Future Highway Construction Costs 2009年 2 月 19 日Estimating Future Highway Construction CostsC. G. Wilmot, M.ASCE,1 and G. Cheng, P.E.2Abstract: The objective of this research was to develop a model that estimates future highway construction costs in Louis

2、iana. The model describes overall highway construction cost in terms of a highway construction cost index. The index is a composite measure of the cost of construction labor, materials, and equipment; the characteristics of contracts; and the environment in which contracts are let. Future constructi

3、on costs are described in terms of predicted index values based on forecasts of the price of construction labor, materials, and equipment and the expected contract characteristics and contract environments. The contract characteristics and contract environments that are under the control of highway

4、agency officials, can be manipulated to reflect future cost-cutting policies. Application of the model in forecasting to highway construction costs in Louisiana shows that the model closely replicates past construction costs for the period 19841997. When applied to forecasting future highway constru

5、ction costs, the model predicts that highway construction costs in Louisiana will double between 1998 and 2015. Applying cost-cutting policies and assuming input costs are 20% less than anticipated, the model estimates highway construction costs will increase by 75% between 1998 and 2015.Key words:

6、Highway construction; Costs; Estimation.IntroductionState Departments of Transportation are required to prepare highway construction programs that describe their planned construction activity in the short term. There is usually considerable interest in the program from local authorities, politicians

7、, and interest groups. Draft programs are typically presented to the public and to various agencies at the local, regional, state, and federal level for comment and review. Ultimately, a program will be approved by the state legislature and will become the formal program of construction of the state

8、 Department of Transportation until a new program is developed in the next cycle a few years later.Because individual projects are of considerable importance to politicians and individual interest groups, it is common that progress on a construction program is closely monitored. Any deviation is lik

9、ely to be queried, and the Secretary of the state Department of Transportation or a senior official in the department will often have to defend the situation publicly or in the state legislature. This can lead to perceptions of incompetence and erosion of support from the legislature and the public.

10、To prepare reliable highway construction programs, road authorities must have accurate estimates of future funding and project costs. While future funding is obviously never known witha great deal of certainty, it is often the estimation of project costs that cause upsets in the execution of constru

11、ction programs. Inaccurate cost estimation is one source of error, but another, the escalation in cost of a project over time, is another source disruption to the program that is usually not anticipated and catered for. Typically, when projects are costed, their costs are estimated in terms of the c

12、urrent cost of the project, and this estimate is not adjusted for the year in which the project is scheduled for implementation. These cost increases can be significant and are, of course, cumulative across projects; also, they rise at an increasing rate each year into the future. Estimating future

13、highway construction is the focus of this paper. The model developed in this study was developed with data from the Louisiana Department of Transportation and Development DOTD! and is therefore particular to that state. However, the methodology employed could be employed in other areas.Measuring Pro

14、ject CostsWhen construction in the field lags behind planned construction in the construction program, it is usually because the projects that have been constructed have cost more than anticipated. This is not random variation of actual costs about estimated costs, because, clearly, underestimates w

15、ould cancel out overestimates over time in such a situation. Rather, it is evidence of a consistent underestimateof all projects collectively. The benefit of this is that it can be measured at the overall level, which is much easier to measure than at the individual project level.In the past, change

16、 in overall construction costs has been measured in terms of construction indices. These indices are weighted averages of the cost of a set of representative pay items over time. They have been used to display cost trends in the past. However, there is no reason why cost indices must be restricted t

17、o displaying past trends; they can also portray future overall costs, provided the representative pay items on which the index is based can be forecast. A predictive construction cost index was adopted in this study to describe the change in overall construction costs in the future. The formulation

18、of the index is described later in the paper.Past Increases in Construction CostsWhen the change in overall construction costs in the past is observed(as measured by popular construction cost indices), it is apparent that they change significantly from year to year and that the changes can sometimes

19、 be quite erratic. The common assumption that construction costs change with the rate of inflation can lead to poor estimates of future construction cost. To illustrate, the Federal Highway Administrations Composite Bid Price Index, an index of overall highway construction costs, is plotted in Fig.

20、1 together with the Consumer Price Index (CPI), a common expression of general inflation. The FHWA CBPI for the entire nation and for Louisiana alone is plotted in the diagram. All indices have been normalized to a value of 100 in 1987 for comparison purposes. From the diagram, it is clear that high

21、way construction costs change erratically and even display different short and long-term trends from to those of the CPI. It is also apparent that construction cost changes are different in Louisiana from those in the nation as a whole. While not shown here, review of the FHWA CBPI from other states

22、 shows that many of them show a deviation from national values.Past Methods of Forecasting Highway Construction CostForecasting future highway construction costs has been achieved in basically three ways in the past. First, unit rates of construction such as dollars per mile by highway type have bee

23、n used to estimate construction costs in the short term. However, this method has generally been found to be unreliable, because site conditions such as topography, in situ soil, land prices, environment, and traffic loads vary sufficiently from location to location to make average prices inaccurate

24、 estimates of the price of individual projects or even of all projects in a particular year. Second, extrapolation of past trends, or time-series analysis, has been used to forecast future overall construction costs (Koppula 1981; Hartgen et al. 1997). Typically, construction costs have been collaps

25、ed in these analyses to a single overall expression of constructioncost such as the FHWA CBPI or the Engineering News Records Building Construction Index ENR BCI! or Construction Cost Index ENR CCI!. However, these types of models are usually only used for short-term forecasting due to their relianc

26、e on the notion that past conditions are maintained in the future. Third, models have been established that describe construction costs as a function of factors believed to influence construction costs. The relationship between construction costs and these factors have been established from past rec

27、ords of construction costs. Typically, the models established in this manner have been used to estimate the cost of individual contracts. These models, with their relational structure, are the only models expected to provide reliable long-term estimates. The model developed in this study is of this

28、type.Proposed Construction Cost ModelIt is clear that there are numerous factors that affect construction costs. However, it is striking that most construction cost models developed in the past have used only a few of the many influential factors identified above. One reason for this is that informa

29、tion is generally not available on many factors in data sets used to estimate models. Another reason is that information on the qualitative conditions surrounding each contract is difficult to obtain. These are problems that prevail in most circumstances and are difficult to overcome.To mitigate aga

30、inst the effect of an incomplete set of factors, two strategies can be employed. First, it may be possible to represent some of the absent factors by surrogate variables that are in the data set. For example, as mentioned earlier, annual bid volume has been used in the past as an inverse measure of

31、the level of competition prevailing in the construction industry at that time (Herbsman 1986). Similarly, the number of plan changes each year can serve as a measure of design quality. Second, if the modeling of construction cost is changed from estimating the cost of individual projects to estimati

32、ng overall construction costs each year, the modeling task is simplified. This is because it is no longer necessary to try to model individual projects in which conditions inflate the price in one case and deflate it in another, since such conditions would tend to cancel themselves out among project

33、s in the same year. For example, firms that reduce their bid prices in an effort to win a particular contract could be balanced out within the same fiscal year by those that increase their prices because they already have enough work and are not particularly interested in winning the contract. Simil

34、arly, those firms with expertise in the type of construction required will be balanced out by those with low levels of expertise in that area. Thus, it is generally more tolerable to operate with fewer relevant factors when modeling at the aggregate or overall level than when modeling at the disaggr

35、egate level.The objective of this study is to establish a model, estimated on historical quantitative data, that incorporates as many relevant variables as possible and is capable of estimating the future overall cost of highway construction on an annual basis. The model is intended to assess the im

36、pact of alternative future conditions on highway construction costs and assist officials of the Louisiana DOTD to identify management policies that will help limit the increase in highway construction costs in the state.It was also the perception of those interviewed that contracts let in the fourth

37、 quarter of the fiscal year tended to result in higher bid prices. This was because there was a tendency for projects to accumulate in the fourth quarter due to various delays, and the increased volume of projects resulted in decreased competition among contractors.Model StructureThe model developed

38、 to predict overall highway construction costs in this study is based on five submodels of price estimation. Each submodel estimates the price of a pay item representative of cost model a dominant construction area. Dominant construction areas were identified from past expenditure in different areas

39、 of highway construction. From the Louisiana DOTD data for the period19841997, it was found that more than 50% of all highway construction expenditure occurred in the areas of asphalt concrete surfaces, Portland cement concrete surfaces, excavation and embankment, structural steel, structural concre

40、te, and reinforcing steel. Interestingly, these construction areas are identical to those used to estimate the FHWA CBPI. The structural steel construction area was not included in the model developed in this study, because more than 98% of expenditure in this construction area was bid as a lump sum

41、 in each contract with no record of the amount of steel included in the bid. This made comparison of the cost of structural steel among contracts impossible. The other five construction areas included in the model were all represented by pay items whose prices were expressed in terms of rates, which

42、 permitted comparison among contracts.A schematic representation of the overall model with its five submodels is shown in Fig. 2. Each submodel estimates the price of a representative pay item from each of the five dominant construction areas. The contribution of each submodel to the overall model i

43、s accomplished by combining the prices of the representative pay items in an index similar to that of the FHWA CBPI. In this case, because the formulation is slightly different from the FHWA CBPI and is constructed specifically to reflect past and future overall construction costs in Louisiana, it i

44、s named the Louisiana Highway Construction Index and is defined asValidationModel performance is ideally validated using data not used in the estimation of the model. In this case no such data was available. Dividing the existing data set into two portions to estimate the model on one portion and us

45、e the other for validation was not practical, given the limited sample size in some of the submodels. For example, the concrete pavement submodel has a total of only 212 observations, and estimating the submodel on the highly variable data on fewer observations would reduce the accuracy of the estim

46、ates. Thus, the performance of the model was assessed by observing how well it reproduced observed construction costs.Using the same data as that on which the model was calibrated, the estimated and observed LHCI values for the period 19841997 are shown in Fig. 3. The 95% confidence limit of the obs

47、erved LHCI is also shown in the figure to illustrate that the estimated LHCI values are, for the most part, contained within the 95% confidence limit of the observed LHCI values. The chisquared test of the similarity of the estimated and observed LHCI values indicates that a significant difference c

48、ould not be observed at the 99% level of significance.Investigating the behavior of the construction cost index in Fig. 3 reveals interesting reasons behind the observed behavior. Reviewing the data and observing its impact on the forecasts through the model allows an analyst to determine the primar

49、y causes of change in construction costs during certain periods in the past. For example, the main cause of the decrease in construction costs observed in the period 19841986 can be traced back to a decline in labor and petroleum costs during that period. The rapid increase in construction costs fro

50、m 1995 to 1996 was primarily due to a combination of rising petroleum costs and an increased proportion of smaller contracts. The drop in construction costs observed immediately following this event (i.e., in 1997) was mainly the consequence of an increase in the average size of projects from those

51、let in 1996, very few projects being let in the fourth quarter, and a decrease in the average duration of projects.ConclusionsThis study has shown that the literature indicates that a comprehensive set of factors contributes to the cost of highway construction. In this study, the most influential fa

52、ctors were found to be the cost of the material, labor, and equipment used in constructing the facility. However, characteristics of individual contracts and the contracting environment in which contracts are let also affect construction costs. In particular, contract size, duration, location, and t

53、he quarter in which the contract is let were found to have a significant impact on contract cost. Bid volume, bid volume variance, number of plan changes, and changes in construction practice, standards, or specifications also make a significant impact on contract costs. Other factors are expected t

54、o have an impact on construction costs but were not included in this analysis because no data on their values were available.The model developed in this study reproduces past overall construction costs reasonably accurately at the aggregate level. Predicted overall construction costs are not signifi

55、cantly different from observed costs at the 99% level of significance. This accuracy is largely the result of the aggregate level at which construction costs are measured in this study; at the individual contract level, the submodels capture only between 42 and 72% of the variation in the data. It i

56、s suspected that much of this variation is due to unobserved, essentially subjective factors that influence the bid prices in individual contracts. However, some of these idiosyncratic variations at the individual contract level average out in the aggregation process.This model can be used by highwa

57、y officials in Louisiana to test alternative contract management strategies. Increasing contract sizes, reducing the duration of contracts, reducing bid volume and bid volume variance, reducing the number of plan changes, and reducing the proportion of contracts let in the fourth quarter all serve t

58、o reduce overall construction costs. Highway officials can assess the impact of strategies they believe are achievable by applying the model. Most importantly, though, the model can assist in estimating future construction costs and providing the means to produce more reliable construction programs.

59、ReferenceAssociate Professor, Louisiana Transportation Research Center and Dept. of Civil and Environmental Engineering, Louisiana State Univ., Baton Rouge, LA 70803-6405.Civil Engineer, GEC, Inc., 9357 Interline Ave., Baton Rouge, LA 70809. C. G. Wilmot, M.ASCE, and G. Cheng, P.EEstimating Future H

60、ighway Construction CostsJOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ASCE / MAY/JUNE 2003:272279Huyn P.N., Geneserth M.R. and Letsinger R. (1993). Automated concurrent engineering in design. World Computing, Vol. 26 (1), pp 7476. ISO (1994). ISO 10303-1 Part 1: Overview and fundamental princi

61、ples, International Organization for Standardization, Geneva, Switzerland. Kalay Y.E., Khemluni L. and Choi J.W. (1998). An integrated model to support distributed collaborative design of buildings. Automation in Construction, Vol. 7 (23), pp 177188. Lee H.K., Lee Y.S., Kim K.H. and Kim J.J. (2007).

62、 A cost-based information model for an interior design in a large-scale housing project, ICCIT 07, 2007 International Conference on Convergence Information Technology, Poster Sessions: Session 4.Luiten G.T.B. and Tolman F.P. (1997). Automating communication, in civil engineering. Journal of Construc

63、tion Engineering and Management, Vol. 123 (2), pp 113-120. 公路建設(shè)造價的未來C. G. Wilmot, M.ASCE,1 and G. Cheng, P.E.21聯(lián)合教授,路易斯安娜運輸研究中心和國家環(huán)境工程局,路易斯安娜國立大學(xué)2注冊工程師摘要;本文的目標(biāo)是建立一個用來估算路易斯安娜未來公路建設(shè)所需的工程費用的模型。根據(jù)公路建設(shè)造價索引,該模型介紹了中所有公路建設(shè)的工程費用。這索引是一份綜合定額,包括建造的人工費,材料費和機(jī)械費,項目特征和項目周邊的環(huán)境情況等等。未來工程的費用是用預(yù)計值來進(jìn)行指定的,預(yù)計值是建立在建造人工費,材料費

64、,機(jī)械費和預(yù)見項目特征和項目環(huán)境基礎(chǔ)上的預(yù)測價格。在公路管理機(jī)構(gòu)控制下的項目特征和項目環(huán)境能可根據(jù)未來的成本削減政策來操作處理。公路造價預(yù)算模型在路易斯安娜的運用表現(xiàn)出這模型幾乎是19841997年時建設(shè)造價模型的重現(xiàn)。未來在運用公路造價預(yù)算時,該模型預(yù)測路易斯安娜的公路造價將在1998年到2015年間的增加兩倍。在應(yīng)用削減成本政策和假設(shè)投入的資金比預(yù)算減少20%的情況下,模型預(yù)測公路造價將在1998年到2015年間提高75%。關(guān)鍵詞:公路建設(shè),造價,預(yù)算引言國家交通部被要求籌備能反映他們短期建設(shè)計劃的公路建設(shè)綱要。通常地方當(dāng)局,政治家和利益集團(tuán)都會對此項目投以極大的關(guān)注。草案一般會向社會、地

65、方、省、國家各部門和標(biāo)準(zhǔn)聯(lián)合會征求意見和建議。最后,項目將由國家立法機(jī)關(guān)批準(zhǔn),在一段時間后的下一輪新項目立項中成為國家交通部的正式建設(shè)項目。因為特殊項目對于政治家和個別利益集團(tuán)是非常重要的,通常要對工程過程進(jìn)行監(jiān)理。任何偏差都有可能被質(zhì)疑,國家交通部長和資深官員將不得不公開或找國家立法機(jī)構(gòu)對情況進(jìn)行辯護(hù)。這會導(dǎo)致使人不相信你的能力,并使來自立法機(jī)構(gòu)和公眾的支持受到?jīng)_擊?;I備可靠的公路建設(shè)項目,公路管理機(jī)構(gòu)必須對預(yù)留資金和工程造價有精確的評估。然而很明顯,預(yù)留資金永遠(yuǎn)不能確保,通常是對在建設(shè)項目實施中引起混亂的項目造價的評估。不準(zhǔn)確的造價意見是一個錯誤來源,但另一方面,不斷過時的工程造價是另一個使項目失敗的原因,這些通常沒有預(yù)料和準(zhǔn)備,一般,工程造價是根據(jù)一系列現(xiàn)在的工程造價判斷的,如果不符,完工時進(jìn)行調(diào)整。造價增加是有效的,當(dāng)然是漸增的,而且,他們每年按一定比例增加。本文的核心是估計未來公路建設(shè)。本研究中模型建立的資料來自路易斯安娜交通和發(fā)展部(DOTD),是特別針對這個州的。然后,這種方法可在其他領(lǐng)域使用。項目造價估量當(dāng)某領(lǐng)域建設(shè)落后于建設(shè)計劃中的進(jìn)度,通常是因為已經(jīng)建造的項目費超過了預(yù)期費用。實際費用相對于預(yù)算不是隨意變動的,因為很明顯在這種情況下過低估計與過高估計會相互抵消。而且,這是所有項

展開閱讀全文
溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

相關(guān)資源

更多
正為您匹配相似的精品文檔
關(guān)于我們 - 網(wǎng)站聲明 - 網(wǎng)站地圖 - 資源地圖 - 友情鏈接 - 網(wǎng)站客服 - 聯(lián)系我們

copyright@ 2023-2025  zhuangpeitu.com 裝配圖網(wǎng)版權(quán)所有   聯(lián)系電話:18123376007

備案號:ICP2024067431-1 川公網(wǎng)安備51140202000466號


本站為文檔C2C交易模式,即用戶上傳的文檔直接被用戶下載,本站只是中間服務(wù)平臺,本站所有文檔下載所得的收益歸上傳人(含作者)所有。裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對上載內(nèi)容本身不做任何修改或編輯。若文檔所含內(nèi)容侵犯了您的版權(quán)或隱私,請立即通知裝配圖網(wǎng),我們立即給予刪除!