【機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯】JT調(diào)度絞車【word英文2339字5頁word中文翻譯3549字4頁】
【機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯】JT調(diào)度絞車【word英文2339字5頁word中文翻譯3549字4頁】,機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯,word英文2339字5頁,word中文翻譯3549字4頁,機(jī)械類,畢業(yè)論文,中英文,對照,對比,比照,文獻(xiàn),翻譯,jt,調(diào)度,絞車,word,英文,中文翻譯
Abstract
? First、 Scheduling and the structural characteristics of winch
scheduling winch is used to dispatch vehicles to assist traction and operating a winch. Commonly used in the mine tunnel in the haulage and supporting mine car handling、 can also be used in the mining face、 with scheduling space station、 heavy cars.
· ??Scheduling winch is full-gear transmission machinery. Gear also known as the round of the transmission system. According round of the transmission gear when the axis of space in the relative position is fixed、 can be divided into fixed and working capital of the axis round of the round. Another round of the axis of cylindrical mesh gear transmission and the cylindrical mesh gear transmission of points、 and turnover of another round of transmission and differential planetary transmission of the points. Scheduling the winch within the existing transmission gear meshing cylindrical Gear、 another planetary transmission、 scheduling winch planetary transmission gear、 also known as the winch.
???Scheduling winch models commonly used mainly JD-0.4 (JD-4.5)、 JD-1 (JD) -11.4)、 JD-1. (JD-22)、 JD-2 (JD-25)、 JD-3 (JD - 40).
???Below the JD-3 (that is、 JD-40) as an example of scheduling winch on the composition and scheduling transmission principle.
?(A) JD-3-scheduling of the winch
???JD-3-scheduling the main component of the winch drum for、 brakes and motor frame. From the winch drum made of cast steel、 its main function is winding rope traction load. Drum、 and the slowdown in gear with the gear.
???Winch on the two groups with a total installed-gate that is Brake 2、the gateway 3. Motor side of the gate 2 to brake drum brakes、 the gear in the work of three gates used to control Z7 group functioning.
?? Use made of cast iron frame、 the motor bearings and gates with stent-positioning are fixed with bolts in the plane seat. For Flameproof for the thee-phase motor .
?(B) JD-3-Dispatch winch the drive principle
??this type of winch used two Internal Drives and a planetary gear transmission. Z1/Z2 and Z3/Z4 for two Internal Drive、 Z5、 Z6、 Z7 composition of planetary transmission mechanism.
?? Motor head in the installation of a 5-axis extended sets of gear Z1、 through the gears Z2、 with gear Z3 and Z4、 the movement spread to gear Z5、 the Z5 is the planetary gear wheel of a central round (or round of the Sun) And then led the two planetary gear Z6、 and the gear Z7. Planetary gear freely installed in the two driven and connected to a fixed axis、 the largest in the gear Z7 Gear work with the external gateway、 used to control winch drum operation.
?? If the big gear Z7 gate on the work of three gates to live、 and will be on the brake drum gates 2 release、 this time by two motor rotation within the rodents to gear wheel drive Z5、 Z6 and Z7. However、 due to Z7 gate has been living and can not rotate、 so gear Z6 only on the one hand around its own axis of rotation、 but also around the axis of gear Z5 (drum center) to the public. Thus connected with the rotation of the lead、 then Z6 the operation mode very similar to the planets in the solar system (such as Earth) movement、 also known as the planetary gear Z6、 its transmission mode known as the planetary transmission.
??? Conversely、 if the gear Z7 in the work release gate 3、 and will brake drum on the live gate 2、 the Z6 directly connected with the drum、 only for the rotation、 not revolution、 the Z1 from the transmission system changed to Z7 For the fixed axis of the round、 gear Z7 to go short. Inverted for the release (or live gate) gate work Brake 2 or 3、 you can make scheduling winch in the case of non-stop motor to achieve operating and parking. When the need to reverse upgrade、 must be re-activated the launch button、 reverse the motor running.
?? It should be noted that、 when the motor is turned on、 the gate and not allowed to work Brake live gate at the same time、 it will burn motor or other accidents.
Second、 scheduling winch day-to-day maintenance check the contents of
???(1) check each part of bolts、 pin、 nuts、 washers、 etc.、 if loose、 loss should be tightened and timely complement.
???(2) to check installations and electrical signal Operation button is intact and whether stolen explosive phenomenon、 whether the signal sent clear and bright、 it should be repaired or replaced.
??(3) to check whether damaged or broken drum、 the first wire rope is firmly fixed、 bearing oil spill there、 the rope is neatly arranged、 the problems should be promptly dealt with.
??(4) inspection gate with a crack-free、 wear-gauge whether or not (should have a thickness of not less than 3 mm)、 the tension bar bolts、 fork first、 the gate、 such as whether there is a pin deformation or injury、 whether the loose nuts back tight、 Problems should be adjusted and dealt with.
??(5) Check the gate and lever action is a flexible system、 Shi gate、 the ate may not reach the level position、 it should be slightly Sangria than the horizontal position.
??(6) to check the roof fixed winch-and-beam is solid、 based on whether there is a bolt or bolts loose、 whether crack base、 the issue should be dealt with promptly.
??(7) To check whether the normal start motor idling、 whether good grounding to start with、 and so whether the explosion-proof electrical equipment and good demand.
(8) Check bearings and motors、 switches、 cables、 such as whether the gate with the temperature too high、 the problem should be found to identify the reasons for、 to take measures to deal with.
(9) Often wipe winch to remove dust and debris、 and maintain the environment clean and tidy. Winch the safe operation、 inspection and maintenance
Third、 winch common faults and deal with
???? (A) a winch drum abnormal sound and the main approach
???? 1. Winch drum produce abnormal sound the main reason
???? (1) drum cartridge case bolts loose.
???? (2) Shell and tube-round (flange) gap between too large.
???? (3) Drum cylinder shell cracks.
???? (4) Welding a cylinder shell welding.
???? (5) Walks drum and hub of the fixed screw loose、 causing swimming drum and hub between the relative sliding.
???? (6) Gap between the hub and spindle wear too large.
???? (7) A clutch worm screw loose.
??2. Approach
???? According to the inspection to determine treatment. If the loosening of the nut、 in Jiao Ban shutdown when fastening If noise is not serious、 may be appropriate to reduce winch load、 pay attention to observe、 to maintain the provisions of the maintenance shutdown at the repair if the beep serious、 they should immediately Parking repaired or replaced、 so as to avoid accidents expand.
????(B) On the rope winch drum with Bu Shangri hazards、 causes and treatment methods、
??1. Winch drum on the rope with the harm Bu Shangri
???(1) speed up the rope wear. Rope in the mess on the winding drum、 traction force to justice often ranked in the mess in the rope and pressure to get out、 causing serious wear、 resulting in diameter steel wire rope and wire break more ground and shorten the life of the rope.
??(2) Of wire rope slid off the drum. Rope with Bu Shangri、 an inevitable phenomenon of a crowded heap for damage to justice board、 when the reactor crowded the edge of more than high rollers、 the rope easily slid off the drum、 light、 broken wires、 heavy sports car、 and broken rope.
??2. Winch drum on the main rope with Bu Shangri
???(1) winch layout properly that is hoisting cable angle non-compliance requirements.
???(2) Winch Titanium (Preliminary round) Quemoy not with the rope on the winding drum at about sliding.
???(3) Ranked rope winch device failure or have been removed.
?? (4) Improper operation the wound is not tight.
??3. Approach
? According to different situations symptomatic treatment. The installation of quality and exclusive rope devices such as the failure to timely report on the request sent treatment、 operation or maintenance of an improper、 we should conscientiously in accordance with the provisions of meticulous operation and maintenance; Inclined Drift winch paying particular attention to removing obstacles on their way to prevent the re-delegate Of Mandrel、 tight-rope Mandrel.
???? (C) Winch reducer operation abnormal sound and vibration generated in the causes and treatment
???? 1. Reducer functioning of abnormal sound and vibration generated in the main
???? (1) gears meshing space tight or too loose.
???? (2) Bearing gap is too large、 the general performance of the decentralization empty at the beep、 beep when upgrading heavy small.
???? (3) Or bearing reducer bolts loose.
???? (4) Reducer in the swap was foreign bodies.
???? 2. Approach
???? (1) adjusting the gears meshing gap to a suitable position、 if the wear and gear should be replaced.
???? (2) Relaxation of the repair or replacement of bearings.
???? (3) Pay attention to tighten loose screws.
???? (4) If it has fallen into foreign body reducer、 should be immediately suspended、 and troubleshooting.
???? (D) Winch brake gate of the reasons for and treatment of fever
???? 1. Brake winch for fever
???? (1) a gate too early、 too excessive.
???? (2) Weights are often delegated to use Brake、 no electrical power winch braking system
EC、 single-drum winch often such a situation.
???? (3) Brake shoe loose bolts or excessive brake wear、 the bolt hit the first round of gate (or gateway disc).
???? (4) Brake shoe and the gateway round (or gateway disk) was not installed correctly; the contact area is too small.
???? (5) Gate Ferry (or gateway disc) swing more.
???? 2. Prevention and treatment
????? Constantly sum up experience in operations、 and explore methods of operation and improve the level of technique; strict winch the safe operation、 inspection and maintenance of traction control grid load、 no-load、 do not send delegate at the motor-vehicle gate flying; regular maintenance checks、 pay attention to brake shoe and the gateway Round (or gate-) exposure.
???? (5) Disc Brake-meters does not deal with the causes and prevention methods
???? 1. Brake-song disc is not the main meters
???(1) brake operation handle screw drawbars length adjustment inappropriate.
???(2) Brake operation handle swing point of view inappropriate.
???(3) Relief valve plug the hole cut expenditure or slide valve failure death card.
???(4) Relief valve surge devices or electro-hydraulic oil spills.
???(5) electro-hydraulic device moves lap surge Inch Xian welding is not strong or disconnected.
2. Prevention approaches
???the timely adjustment of brake operation handle moves location、 regular cleansing of the hydraulic system of oil filters、 hydraulic oil to maintain the cleanliness and avoid valve plug the hole.
???(6) The launch button、 do not turn the winch motor and Treatment
1. Main
?? (1) A power failure、 such as power failures、 break phase、 motor or grounding line、 grounding the protection of power supply voltage or too low.
(2) Stop button did not recover bit.
???(3) Have launched internal fault.
???(4) Cable operator disconnected.
???(5) Motor burned.
2. Approach
To check power、 such as the local power supply cables on the other electrical and mechanical equipment are a fixed、 it would surely is the power blackout、 should be promptly reported that the request transmission. Check the button、 we must switch handle hit by power outage location、 check the button may be open、 not to repair its damaged in the explosion-proof performance. Several other conditions must be full-time electrician to check processing.
????(7) The stop button、 the motor does not stop the causes and treatment 1. Main
???(1) Operating button failures or too wet.
???(2) Operation of short circuit or grounding.
???(3) Magnetic starter for the main contact point or burning auxiliary contact adhesive and can not leave.
???(4) arc-suppression hood stuck contact、 could not leave.
?? (5) Contact between the open relays.
???(6) Magnetic starter placed unrighteousness、 touch or backward dumping beyond 15 °.
2. Approach
?????? Should urgently Fishing magnetic starter、 to winch their magnetic starter handle the operation to stop fighting position. Pre-gate method should be used first to raise load stopped to prevent Lash starter when the magnetic switch in isolation have too great a power outage sparks.
?? (8) Single-phase operation of the motor causes and treatment
1.Winch motor single-phase operation of the characteristics and hazards
(1) Whether positive start、 or reverse start、 the electrical occurred dull hum、 but the motor will not always turn.
(2) If a motor running in single-phase operation、 while still maintaining the original motor to spin、 but obviously slow down the speed、 a humming sound、 the electrical start fever、 if the winch with Ammeter、 some point to zero、 Some larger current value. Whether or activated in motor running single-phase operation、 if not timely detection and shutdown、 it may be burning motor for the accident.
?2. Single-phase operation of a motor for
???(1) Lack of power (of a fault). This is because of a broken fuse or a disconnection of contacts and a phase-connection is bad、 and so causes.
? (2) Motor stator windings of a break. Stator windings at this time because of the different connection mode、 the impact of differentiated、 that is、 stars (丫) of wiring than 1.30 (△) of wiring serious.
3. Approach
???Rapid shut down to identify reasons for the timely reporting or maintenance electrician for processing.
收藏
編號:12246528
類型:共享資源
大?。?span id="5sknxxg" class="font-tahoma">28.50KB
格式:RAR
上傳時間:2020-05-08
5
積分
- 關(guān) 鍵 詞:
-
機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯
word英文2339字5頁,word中文翻譯3549字4頁
機(jī)械類
畢業(yè)論文
中英文
對照
對比
比照
文獻(xiàn)
翻譯
jt
調(diào)度
絞車
word
英文
中文翻譯
- 資源描述:
-
【機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯】JT調(diào)度絞車【word英文2339字5頁word中文翻譯3549字4頁】,機(jī)械類畢業(yè)論文中英文對照文獻(xiàn)翻譯,word英文2339字5頁,word中文翻譯3549字4頁,機(jī)械類,畢業(yè)論文,中英文,對照,對比,比照,文獻(xiàn),翻譯,jt,調(diào)度,絞車,word,英文,中文翻譯
展開閱讀全文
- 溫馨提示:
1: 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時也不承擔(dān)用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
裝配圖網(wǎng)所有資源均是用戶自行上傳分享,僅供網(wǎng)友學(xué)習(xí)交流,未經(jīng)上傳用戶書面授權(quán),請勿作他用。